Could I help you?
Reduced price! View larger

ASME OM S/G

New product

ASME OM S/G 2007 Edition, October 17, 2007 Standards and Guides for Operation and Maintenance of Nuclear Power Plants

More details

$142.80

-58%

$340.00

More info

Description / Abstract: This Part establishes the requirements for preservice and inservice testing to assess the operational readiness of certain closed cooling water systems (CCWS) used in LWR power plants.

The CCWS covered are those required to perform a specific function in shutting down a reactor to the safe shutdown condition, in maintaining the safe shutdown condition, or in mitigating the consequences of an accident.

This Part establishes test methods, test intervals, parameters to be measured and evaluated, acceptance criteria, corrective actions, and records requirements.