No products
M00011320
New product
AWWA C213-22
Fusion-Bonded Epoxy Coatings and Linings for Steel Water Pipe and Fittingsstandard by American Water Works Association, 05/01/2022
In stock
The purpose of this standard is to provide the minimum requirements for fusion-bonded epoxy coatings and linings for steel water pipelines and fittings, including materials, application, and testing. This standard can be referenced in documents for fusion-bonded epoxy coatings and linings for steel water pipelines and fittings. The stipulations of this standard apply when this document has been referenced and then only to fusion-bonded epoxy for the interior and exterior of steel water pipelines and fittings.